April Update

Work for the second residential block begins

We poured concrete slabs and started framing 2 out of 8 buildings in the second residential block. This block includes 29 apartments.

The Gym utility system

With much of the Gym exterior completed, we can move forward with installing air conditioning and the Gym's electrical system.

Installing pavers

The installation process for the retail parking lot pavers is coming along nicely. Culdesac Tempe uses a combination of vehicular grade pavers and decomposed granite around the community. These pavers allow heat to escape more effectively than concrete, providing a cooler and more enjoyable outdoor environment in the warmer months.

The Market’s weather protection

The waterproofing membrane around our market building is currently being installed. This system will keep the grocery store and 2nd & 3rd-floor residential units protected from weather year-round.

Installing drywall in the Market

The waterproofing membrane around our market building is currently under installation. This system will keep the grocery store and 2nd- & 3rd-floor residential units protected from weather year-round.