Construction continues on The Hub's podium deck, utilities are installed on the interior of Cocina Chiwas, and stucco goes up on The Market.
The Hub is prepped for a concrete pour, framing continues on the third residential block, and windows are installed.
Second residential block construction begins. The Gym's utility system is being installed along with pavers around the site. The Market's weather protection and dry wall are now in place.
The residential units and gym are connected by a sky bridge and the exterior of Cocina Chiwas gets completed.
Glass installed in Cocina Chiwas and framing begins for our first residential-only pods.
The exterior of Cocina Chiwas gets installed and the walls go up for The Gym.
The 2nd level of The Market gets framed and concrete is poured for The Hub.
Construction begins for The Hub, which includes the café, co-working space, bike shop, and residential units.
Concrete columns for the Market go up and and the foundations for the Gym go down.
Cocina Chiwas gets weather protected and we start the foundation for The Market.
Cocina Chiwas gets a wood frame
The walls for Cocina Chiwas rise and excavation for the water line begins.